EDAR Canet lo Roig

Description

Modification of the Wastewater Treatment System eliminating the treatment of peat beds by installing another solid support by building a reservoir where a biodisc is installed, the execution of a dynamic secondary decanter, a recirculation well and sludge purge, thereby achieving a correct treatment of wastewater by ensuring discharge conditions into public waterways.

The performance is completed with the remodelling and adaptation of the control building made of separate areas for offices, toilets and storage area, finishing with painted stone and cement mortar. We install pipes and secondary decanter pumps and bridges, as well as electric panels and automation and control equipment.